Design of Hydroelectric Power Plants – Step by Step by Geraldo Magela Pereira

Design of Hydroelectric Power Plants – Step by Step

Geraldo Magela Pereira
628 pages
CRC Press
Sep 2021
1st Edition
Outdoors & Nature WSBN
0
Readers
0
Reviews
0
Discussions
0
Quotes
The design of a hydroelectric plant, along with an installation of transformation of potential energy of water into electricity, is an activity that is not standardized. Each new project is an interesting engineering challenge, and teams need to work in different conditions of each site, integrated to design a functional, economical and environmentally sustainable project. The development of a project, here understood as the plant itself, the reservoir, the maneuver substation and the associated transmission line, is a multidisciplinary activity that encompasses areas of civil engineering, geology, mechanical and electrical engineering, environmental engineering, economic engineering, construction and assembly, and the engineering of operation and maintenance of civil works and electromechanical equipment. The book is organized to facilitate the performance of professional life of the new generations of engineers who will join the Electric Sector, or in other sectors that demand the knowledge regarding hydraulic structures. The book is a simple manual providing the practical step-by-step procedure for designing hydroelectric plants, including legislation, with a general view of the project.
Join the conversation

No discussions yet. Join BookLovers to start a discussion about this book!

No reviews yet. Join BookLovers to write the first review!

No quotes shared yet. Join BookLovers to share your favorite quotes!

Earn Points
Your voice matters. Every comment, review, and quote earns you reward points redeemable for Bitcoin.
Comment +5 pts Review +20 pts Quote +7 pts Upvote +1 pt
BookMatch Quiz
Find books similar to this one
About this book
Pages 628
Publisher CRC Press
Published 2021
Readers 0